Kreminska Substation 500/220/35

NEC "Ukrenergo" facility
About the project

The 500 kV “Kreminska” substation is the first new substation of this voltage class in the history of modern Ukraine. A lot of unique for our country solutions are implemented there.

The Extreme LTD company produced power switchboards for the project.

 

Works and services performed
Design
Extreme LTD developed the project documentation
Production
The switchboard equipment was manufactured at the Extreme LTD plant in Boryspil
Assembling
Specialists of the Extreme LTD company performed installation, assembling and commissioning works
Project details
Delivery scope:
  • panels of own needs 0.4 kV: 1 x 1600 A, 2 x 1000 A
  • DC switchboard: 2 x 200 A