Kreminska Substation 500/220/35
NEC "Ukrenergo" facility
The 500 kV “Kreminska” substation is the first new substation of this voltage class in the history of modern Ukraine. A lot of unique for our country solutions are implemented there.
The Extreme LTD company produced power switchboards for the project.
Works and services performed


Design
Extreme LTD developed the project documentation


Production
The switchboard equipment was manufactured at the Extreme LTD plant in Boryspil


Assembling
Specialists of the Extreme LTD company performed installation, assembling and commissioning works



Delivery scope:
- panels of own needs 0.4 kV: 1 x 1600 A, 2 x 1000 A
- DC switchboard: 2 x 200 A